Skip to main content

LLD Release Notes December 2025

Updated this week

IMPROVEMENTS

Move Bill of Materials (BOM) window

To make it easier to review large jobs, the BOM opens in its own window so you can easily move the BOM view to a new location on your screen or another screen.

To activate this feature you will need to adjust your user settings

for Preferred BOM mode from Embedded to New Window

Then scroll to bottom and

If you leave as EMBEDDED you can still move the BOM menu but not to a new screen.

While the BOM menu is open select the

icon in the top left of the BOM menu and the menu will change to an independent window.

Then click and hold

to move it to desired location.

If you exit the job the window will close.

Lyves (ERP) Order Number visibility

To assist with communication about your orders, the Lyves Order number is now visible in the design and in the jobs menu.

When a Lyves number is available for an order it will be displayed in the green triangle on the bottom RHS.

It can also be seen in the design page under the CHECK ENGINEERING button

Partial Attachment beam options

For partial attachment, can now select to have a beam along the fascia. Select the option in the MODIFY ATTACHMENT

Change from CON110 to BK26 bracket

NSW, SA and WA now use BK26 bracket for receiver channel attached

Move Notes and Arrows

There is now the ability to modify the position of a drawing note and arrow.

Select the note you wish to move.

Select the adjustment required Position, Arrow etc

Cutout segments increased

To enable the ability to design more complex cutouts, the number of segments for a cutout has been increased from 6 to 10 this is available in the properties menu.

Bug Fixes

  1. You can now select slotted gutter for skillion and gables in all states;

  2. Fixed engineering and cantilever error in dule gable design which caused rafters to be drawn incorrectly;

  3. Corrected rafter length calculation to prevent rafters being specified longer than required;

  4. Modified pan fixed screw length for insulated panel screws;

  5. Updated nesting calculations for posts for decks;

  6. Text placement for drawing of double beam has been updated;

  7. Corrected dutch gable flashing length calculations so flashings match geometry;

  8. Updated engineering documents to reflect slab‑fix connections as per the customer’s design/order, so council engineering matches the actual fix method;

  9. Integrated Revolutio data into deck engineering council documents so they show the updated wind rating for approvals;

  10. Corrected rules so posts cannot be placed under beam breaks in attached area scenario, aligning geometry with engineering rules;

  11. Updated so rear overhang flashing is generated and appears in the BOM/drawings for reverse insulated skillion;

  12. The structure height is calculated/stored so it aligns with Revolutio’s requirements and data model for engineering;

  13. For NSW, for high wind areas, users can now select Cyclonic National Carport

  14. For QLD users specifying Apollo insulated panel the default overhangs have been corrected;

  15. For QLD gable structure default setting is NO FOOT TRAFFIC

  16. For QLD LYSAGHT QUAD GUTTER™ can be selected for gable structures.

Thank you for your continued support throughout 2025 and we wish you a Merry Christmas and a safe and happy holidays from the LLD team.

Did this answer your question?