IMPROVEMENTS
Move Bill of Materials (BOM) window
To make it easier to review large jobs, the BOM opens in its own window so you can easily move the BOM view to a new location on your screen or another screen.
To activate this feature you will need to adjust your user settings
for Preferred BOM mode from Embedded to New Window
Then scroll to bottom and
If you leave as EMBEDDED you can still move the BOM menu but not to a new screen.
While the BOM menu is open select the
icon in the top left of the BOM menu and the menu will change to an independent window.
Then click and hold
to move it to desired location.
If you exit the job the window will close.
Lyves (ERP) Order Number visibility
To assist with communication about your orders, the Lyves Order number is now visible in the design and in the jobs menu.
When a Lyves number is available for an order it will be displayed in the green triangle on the bottom RHS.
It can also be seen in the design page under the CHECK ENGINEERING button
Partial Attachment beam options
For partial attachment, can now select to have a beam along the fascia. Select the option in the MODIFY ATTACHMENT
Change from CON110 to BK26 bracket
NSW, SA and WA now use BK26 bracket for receiver channel attached
Move Notes and Arrows
There is now the ability to modify the position of a drawing note and arrow.
Select the note you wish to move.
Select the adjustment required Position, Arrow etc
Cutout segments increased
To enable the ability to design more complex cutouts, the number of segments for a cutout has been increased from 6 to 10 this is available in the properties menu.
Bug Fixes |
|
Thank you for your continued support throughout 2025 and we wish you a Merry Christmas and a safe and happy holidays from the LLD team.









